Constellation Energy Corporation · Utilities
The price already needs more growth than analysts forecast, at both a 9% and an 8% discount rate.
Signed PPAs, but the price needs incremental hyperscaler deals. At a 14.0% margin the price needs +13.3%/yr against +14.4% consensus, a -6.5pt cushion against a 10.0pt cut (rule: drowns, -20.1pt at 7.9%).
Would recover if: AI capex retrenchment cancels incremental PPAs. We re-check this against analyst estimates every evening.
10 years, at a 14% margin (analysts' margin, cut for cash conversion)
+9.5%/yr over 10 years once faded to terminal growth
points off 3-year analyst growth
17 published targets
Linked to AMZN, GOOGL, META, MSFT, NVDA
Does the profit analysts build their margin on actually arrive as cash? Measured over the last 3 annual statements filed before this test. After stock-based pay, 0% of reported profit arrived as operating cash, so the test cuts the analysts' 16% margin to 8%. That leaves a cushion of −20pt instead of −4pt, and the smaller of the two decides the group. Two or more red flags: this name cannot come out on top, however large its cushion.
How much of reported profit arrived as operating cash. Below 0.8× is a red flag.
Profit not backed by cash, as a share of assets, latest year. Above 10% is a red flag.
Staff paid in shares instead of cash, which flatters margins. Above 10% is a red flag.
Dilution of each share's claim on the business. Above 3% a year is a red flag.
Non-operating gains in the latest year. Above 25% is a red flag.
After capex. Shown for context: heavy investment is not bad earnings, so it is never solved under.
From the priced-in reconstruction of Nov 21, 2026. Its figures use that day's price and free-cash-flow margin, so they can differ from the stress test above.
The price of the price sits 32% below the median of 17 published analyst targets ($290-$380, median $350), meaning the market has heard the entire bull case — hyperscaler power deals, raised guidance, reactor upgrades — and has refused to pay for it.
Whether the signed hyperscaler and TVA-related arrangements convert into contracted, long-duration revenue at the pace the $290-$380 model targets assume — the segment revenue history wired here measures realized regional volume growth (Mid Atlantic +17.5%, ERCOT +22.8% already visible) but cannot verify unannounced contract economics, so this is only partially testable with current data.
What the price refuses to pay for, and the full reconstruction, on the CEG quote page →A stress test of whether this narrative is still paid for by analyst forecasts, not a forecast that the stock will rise. The price-implied growth on its own has not predicted returns in our testing, and this list (sealed Nov 21, 2026) has not been graded yet. Cut sizes are assumptions. Not investment advice. Back to all names